关键词: 铁路工程;施工合同;问题;对策

Abstract: with the country the long-term rail network planning "the establishment and implementation of, the high speed development of railway in historic opportunity. With the gradual opening of construction market, mor in 2007 has formulated the railway construction project tendering demonstrative text ", railway construction market is fine, and standardized by extensive to change direction. Railway construction contract in the position of the construction project is growing. But in railway construction contract in the implementation of the problems in the process of gradually exposed, part of the railway project contract execution rate reduced significantly. Therefore, the author combined with their own management project practice, summarize and analyze the current railway project contract the problems existing in the management, and strengthening the construction of the contract management countermeasures and measures to fundamentally change the status quo construction contract management, reduce the contradictions and wrong contract, improve China's railway engineering construction contract management level.

Keywords: railway engineering; Construction contract; Problem; countermeasures

中图分类号:F715.4文献标识码:A 文章编号:

近年来,随着国家《中长期铁路网规划》的制定和实施,铁路建设迎来了高速发展的历史机遇。既有线一期至六期提速的完成、客运专线、城际铁路的建设、大能力货运通道的建设、电气化铁路的建设等等,铁路建设任务繁重。铁路建设投资由2004年500亿到2008年的3000亿元,2009年-2011年三年铁路投资均为7000亿元。铁路建设工程任务的迅猛增加,给铁路建设合同管理工作带来了巨大的挑战。铁别是铁路施工合同在建设项目中的地位与日俱增。2007年铁道部制定了《铁路建设项目招标示范文本》,铁路建筑市场正在由粗放型向精细化、标准化方向转变,在此背景下,做好铁路建设工程的合同管理工作是确保高质量完成铁路建设工程任务、极大地缓解铁路运能紧张矛盾的客观要求。作为一名在建项目的合同管理者,深感加强铁路建设工程合同管理工作的重要性、紧迫性。笔者结合自身管理实践就铁路施工合同管理工作的任务、特点,以及存在的问题和改进对策谈谈个人的看法。

一、铁路施工合同管理特点

1.标的金额大

铁道部于2011年下发了《关于铁路建设项目施工招标标段划分工作的指导意见》(铁建设[2011]182号文),高速铁路和长大干线站前工程,包括路基、桥涵、隧道、轨道等工程,标段招标额一般不少于25亿元,项目招标额少于25亿元的应划为1个标段。站后工程原则采用“四电”系统集成方式进行大标段承包。其他新建铁路和改建铁路标段划分也在10亿元以上。如此大的合同金额,合同中一旦存在大的漏洞或合同履行出现问题,其带来的纠纷和后果也是不可估量的。

2.履约时间长

按照目前的大标段施工,施工合同工期一般在三年以上,比如北京动车段工程总投资74亿,合同分为段内和走形线两个标段,除了征地拆迁,段内合同额24.4亿,走行线合同额9.8亿元,合同工期均在3年以上。如此长的工期给合同履行带来了更多的不确定性 ,造成变更设计增多、补充合同增多,合同变数大,风险大。拿北京动车段工程来说, I类变更就达20项目,涉及金额10.3亿,II类变更就有上百项,政策性调整就达亿元,补充合同签订6份。

3专业性强

由于铁路工程专业性强以及概预算体系相对独立,尽管2007年国家发展改革委员会牵头颁布了《工程招标投标标准文本》,合同条款也进行了细致的约定,由于铁路工程的特殊性,2007年底,铁道部在《工程招标投标标准文本》的基础上,几经修改形成了《铁路工程招标示范文本》,针对铁路工程的投资体系,对合同条款了比较符合铁路管理思路的修改,特别是在价款调整及风险包干费的约定方面,要将合同管理做到位,必须认真研究铁路投资体系和专业特点,加强合同管理,比如铁路施工特别是既有线铁路施工,涉及铁路站段比较多,包括工务段、电务段,供电段以及铁路多经企业,局职能部门涉及计划处、财务处、道口办、工务处、电务处、供电处、运输处、总工程师室等各部门,一项施工合同的履行,涉及专业多,在签订诸如安全协议、施工配合协议时,一要注意条款的约定,二要加强与建设项目管理机构和基层站段的沟通,做到协议金额有理有据,降低一切合同风险。

4.紧急任务多

铁路是国民经济的重要基础设施。目前,铁道部仍然政企合一,铁路系统是国有的、高度集中、半军事化管理的运营单位,因此,铁路既具有企业营利性,又具有社会公益性。由于国家的、政治的、社会的各种迫切需要,往往有一些紧急工程任务需要完成(比如:六期提速改造工程、京津城际轨道交通工程、哈大客运专线工程等),在时间紧、任务重的情况下,如何加强合同管理,防范合同风险,就更加重要。

二、合同管理中存在问题

1.I类变更、II类变更界定不清楚

目前,铁道部对变更设计执行的是《铁路建设项目变更设计》(铁建设[2006]146号文),变更设计指施工图经审核修改批准后至工程正式验收前变更施工图的活动。I类变更设计并未定义,而是给出五个条件,分别为变更规模、主要技术标准、重大方案的;变更主要批复意见的;变更涉及运输能力、运输质量、运输安全的;变更重点工点的设计原则;变更一次增减投资300万元(含)以上的;从表面上看,I类变更已经很细致很全面,但是在实施过程中容易出现以下偏差:规模、主要技术标准、重大方案的含义是什么却没有详细的定义,造成很多项目虚报I类变更,变相套取国家资金。另外仅仅靠300万元来界定是否I类变更未免牵强。新建北京动车段工程于2009年上报的绿化工程、过渡工程、外电源工程、交通导改工程以及京沪有砟改无砟等五项I类变更,每一项变更均在1000万元以上,但铁道最终批复意见为按II类变更处理,在基本预备费中调剂解决。若按照300万元这一条,本来一个整体的变更设计却要拆成很多小于300万元的II类变更显得非常牵强。建议将I类变更重新定义为在初步设计文件批准后至工程正式验收前对批准初步设计文件以及由此引起的施工图设计文件的变更,如采取初步设计招标,要深化初步设计,不能轻易改变初步设计批复原则而发生变更设计。“146号”文中II类变更定义为对施工图的其他变更。II类变更在执行过程中容易偏差归纳如下:将施工图量差当作II类变更、风险包干费项下的II类变更与基本预备费中解决的II类变更设计难以界定、大于300万元但并不属于I类变更的项目是否属于II类变更,这些问题在施工合同执行过程中难以界定,给合同管理造成了很大的难度。

2.甲供材料设备范围太大,供应不及时,影响工期,同时施工单位积极性不高。

铁道部于2006年至2009先后制定并调整了《甲供材料设备供应目录清单》,甲供的范围从钢筋、水泥、轨枕、钢轨、扣配件到通信、信号、电力、材料设备,内容非常全面。在实施过程中通信、信号、电力材料设备由于专业性强,并且涉及铁路核心技术,甲供所带来优势非常明显。但就钢筋来说,由于需求量大、规格型号多、供应时间长以及价格变化不稳定等因素,铁道部为了降低成本统一向钢厂进行招标,价格采取固定单价,但实际情况是:由于钢厂轧钢批次限制,一个钢厂往往难以满足一个项目全部钢材,造成供应不及时,个别项目出现工期拖延现象。另外由于是铁道部统一采购钢筋,施工浪费钢筋现象非常严重,并且个别项目供货难以满足实际进度造成工程停滞,增加了施工成本,同时也增加了投资。从另一个层面上,由于施工单位基本上没有大宗物资采购权,施工单位积极性不高。

3.甲供设备税金问题以及重复缴税问题

目前,甲供设备,建设单位在付款给材料设备厂家时,必须缴纳0.3‰印花税,根据铁道部《关于铁路建设项目甲供甲控物资设备招标有关工作的指导意见》(铁建设函[2007]495号),甲供物资设备纳入施工承包合同中,施工单位在竣工时,得按照合同总额缴纳0.3‰印花税,这样甲供材料设备的印花税重复缴纳一次。

根据财政部规定,需安装或不需安装的甲供设备可以纳入施工总承包合同营业额中,纳入营业额的甲供设备需缴纳3.35%的营业税。比如北京动车段检修基地工程,机务设备总额达12.5亿元,按照3.35%的营业税,光税金就高达4000多万元。施工单位拒绝对甲供设备开票,而这些施工单位在签订合同时就应该考虑清楚,因为按照财政部规定,作为安装的甲供设备可不纳入营业额,如果当初施工单位考虑到此问题,就不会与建设单位造成不必要的争议。

4.建设单位管理费超支问题

目前,铁路项目超概算现象非常普遍,究其主要原因如下:(1)管理体制因素;由于各铁路局作为建设单位,各铁路局所处地域不同,工资差异比较大,再加上铁道部对不同投资规模人员如何定编未作出规定。现实中,建设单位定远弹性很大,一个建设单位少则几十人,多则上百人,因人设人情岗的现象时有发生,人员组成不精干,引起管理费用增加。(2)办公现代化;随着社会经济飞速发展,建设单位办公设施也在不断更新换代,引起管理费增加,但同时也是管理的需要,现在建设单位普遍实行电脑办公,各铁路局还要求建立内部局域网及网站,实行了网络化工程;建设单位还要租赁像样的办公场所及加以装修,以上费用对投资规模不大的项目来说所占比重不小。(3)车辆购置及使用费;铁路施工一般点多、线长,建设单位管理人员要经常到施工现场进行各种检查,必须购置车辆,才能满足施工需要。(4)建设规模扩大;由于建设规模的扩大,I类变更设计增多,工期相应延长,建管费相应增加,同时也会增加相应审计(审价)等相应费用;(5)建设单位的管理水平;目前铁道部项目管理模式是一个大型基建项目组建一个指挥部,这样一来在铁道项目集中上马的这几年,成立了很多临时指挥部,由于指挥部人员均从运营单位临时抽调,责任心不强,有经验的管理技术人员也较为缺乏,工作效率不高,引起日常管理费用增加。(6)建管理费计算问题。由于目前大型基建工程,各客专公司以及高铁公司采取委托各铁路局代建制,代建工程建管费按照整工程总投资对应费率乘以代建范围工程总投资计算,这样就造成与按代建范围单独计算的建管费偏差太大,使建管费难以控制。另外一部分工程为贴膏药工程”比如北京动车段工程,走行线标段由京沪高速铁路工程、走行线工程、京石动车走行线工程三部分构成,其中京沪高速铁路工程资产划归京沪公司,京石动车走行线工程资产划归京石客专公司,但是在计算建管费时,京沪工程和京石走行线尽管属于单独键名,但是必须按照动车段整个投资进行计算建管费,造成建管费费用不足。(7)甲供物资设备多,北京动车段工程甲供物资设备达21亿元,已交印花税242.58万元,光印花税一项就占了初步设计批复建设单位管理费总额1422.08万元的17%。

5.工程保险费缴纳问题

目前,铁路施工总承包合同中均规定建筑工程一切险、安装工程一切险,并且专用条款中也要求由承包人负责交纳,在风险包干费中处理。但在实施过程中,由于建筑工程一切险和安装工程一切险费用较大,占去风险包干费很大比例的费用。部分高风险隧道、地质复杂桥梁地段,施工单位为了降低施工风险,在建设单位的强行要求下,能够顺利缴纳这项费用,但是如在北京上海等城市枢纽铁路工程,由于地处平原、地质情况良好,施工单位认为风险度不高,一般就不愿意缴纳此项费用,建议施工合同要灵活掌握,分标段、分情况、分工程缴纳工程保险费。

6.投资检算问题;

投资检算的作用是建设单位对设计质量考核的依据,为政策性费用调整计算的基础,也是设计单位内部质量控制、优化设计方案的基础。但是在实施过程中,投资检算得作用被歪曲本身的意义,投资检算的作用变为:方案、标准变化较大时,作为合同谈判的基础;投资检算较批复减小时,作为一个变更设计的“水库”;投资检算较批复增加时,作为挖掘变更设计的题材库。

7.补充合同签认不及时

按照施工合同约定,征地拆迁增加费用、甲供料差均按照I类变更处理,每半年上报一次,但是按照目前投资审批体制,征地拆迁增加费用往往在清理概算时才解决 ,甲供料差由于牵扯到验工计价比例系数以及第三方审价等问题,往往在清概前处理,签订补充合同往往在清理概算后进行。比如拿甲供设备来说,在实施工程中,就已安装调试,财务按照合同约定也付款完毕,由于验工计价也是对每一台甲供设备单独计价,但从另一方面,由于甲供设备差尚未批复,补充合同难以及时签订,造成未批先验工计价的问题。

三、解决对策

1.I类变更和II类变更设计的范围的界定

比如在合同谈判时,施工单位和建设单位可针对本工程的特殊情况就可能发生的I类变更和II类变更范围和内容进行详细的约定,特别是关于重大规模、重大工期、重大标准的定义以及那些II类变更在风险包干费中解决,那些II类变更在基本预备费中调剂解决。这样可避免在变更设计时出现界面不清的情形。

2.甲供材料设备模式的创新

对于像钢筋、水泥等影响工程结构质量的大宗物资,铁道部负责对合格供应商进行审查,并定期颁布合格供应商名录,建设单位负责招标采购的具体实施。按照目前铁道部相关招投标的规定,可以在合格供应商名录范围内选择质优价廉的材料设备,这样既可以控制工程材料质量,又可体现建设单位根据工程进度即时采购的灵活性,不至于发生材料囤积或发生采购不及时而影响工期的情况。

3.甲供设备税金问题

针对工艺设备比较多的工程,在招标前,建设单位一定要仔细研究,根据财政部规定,对于不需计入产值的安装甲供设备,可以从营业额中去掉,这样可避免在招标后出现甲供设备重复缴纳营业税的问题。

4.建管费超支问题

针对建管理费超支问题,一要建立激励考核约束机制,将费用控制的好坏与建设项目年度考核以及建设项目负责人的业绩考核及任免提拔挂钩,促使管理者提高管理水平,充分调动建设单位的积极性。二要做好建管费用分年度预算控制,工资总额年度总控制度。三要严格控制招待费,减少不必要的支出。四要降低办公设备超标化。

5.工程保险问题

建设一切险和安装工程一切险本来是建设单位和施工单位转移风险的一种手段,但是不能一概而论,在在合同中要根据整个工程风险情况,分工点、分标段进行分析,比如对于围岩和地质不太好的长大隧道,一定要缴纳工程保险,而对于地基比较问题,可以由建设单位和施工单位灵活掌握。

6.投资检算问题

投资检算作为建设单位控制投资的一个有效的手段,建设单位一定要重视投资检算的作用,不能作为形式,避免”差、错、漏、碰”现象,既可以加强对设计单位进行考核又可以有效的控制投资,防止不合理的I类变更以及II类变更的发生。建设单位可委托第三方进行审核制度,强化投资检算作用。

四、结束语

过去,由于铁路比较封闭,计划经济体系加上半军事化管理,“先施工、后算账”现象非常普遍,存在一种“合同是形式,喝酒才是关键”的思想,但是现在随着铁路市场化程度的加快,中建、中水、中交、中铁各施工企业全面进军铁路市场,铁路建设单位也要逐步规范合同管理,在招标时,在合同专用条款中根据工程特点细化合同,提出与本工程相适应的管理要求,严格防止合同漏洞。而作为进军铁路市场的各施工单位也应调整思路,加强合同管理,做好并加强合同前审查、合同中动态管理以及合同后评估。真正由过去的“先施工、后算账”,逐步转变为“边施工、边算账”的动态合同管理方向。

参考文献:

[1]何伯森. 国际工程合同与合同管理[M]. 北京:中国建筑工业出版社,1996.

[2]郝杰忠.建筑工程施工项目招投标与合同管理:招标投标分册[M].北京:机械工业出版社,2007.

[3]刘伊生.建设工程招投标与合同管理:修订本[M].北京:北京交通大学出版社,2002.

[4]胡季英,关柯.我国建设工程管理存在的问题及对策[J],苏州科技学院学报:社会科学版,2004(2):25-27.

[5]任宏,工程管理概论[M].北京:中国建筑工业出版社,2007.

[6]孙书阁.建筑工程施工合同管理与实务[M].郑州:黄河水利出版社,2006.

[7]余立中.建设工程合同管理[M].广州华南理工大学出版社,2005.

[8]王福元.目前建设工程合同管理中存在的问题与对策[J],沈阳师范大学学报:自然科学版,2010:28卷2期

[9]方远明.当前施工合同管理中存在的问题分析与对策思考[J].铁道工程学报,2003(2):135-137

[10]胡文发.工程项目管理[M].北京:化学工业出版社,2008.

[11]徐炜.建设工程合同管理存在的问题及解决措施[J].山西建筑,2005(10):151-152.

Problems in Management of Construtional

Engineering Contracts andCountermeasures

Abstract: along with the country" in long-term railroad network plans" in the formulation and implementation of railway in high speed, the historical opportunity of development. With the railway construction market is progressively and open, the railway ministry in 2007 formulated the" railway construction project bidding demonstration text", railway construction market is by extensive model to intensive, standardization direction change. Railway construction contract in construction project position grow with each passing day. But in the railway engineering construction contract in the implementation process problems gradually exposed, part of the railway project contract compliance rate was significantly reduced. For this, the author combines oneself management project practice, this paper summarizes and analyzes the present railway engineering construction contract management problems, and put forward to strengthen construction contract management countermeasure and measure, in order to fundamentally change the status quo of construction contract management, reduce the contract contradictions and errors, improve our country railway engineering construction contract management.

Keywords: Railway Engineering; construction contract; problem; countermeasure

作者简介:

合同存档管理范文2

甲方:___________________________

乙方:___________________________

根据国家有关法律规定,本着双方互惠互利,共同发展的原则,经甲方、乙方双方协商,特订立本协议,以便双方共同遵守。

一、乙方自愿将档案、资料寄存在甲方。

二、乙方寄存的档案、资料所属年度为_________到_________;档案数量为_________卷,具体见交接清单。

三、乙方的档案寄存保管期为_______年,从_______年______月______日起至_______年______月______日止。

四、乙方按标准向甲方缴付寄存费_________元后,双方办理寄存档案的交接手续。

五、寄存期内乙方因特殊情况须提前退回寄存档案的,甲方不退还寄存费。

六、寄存期满乙方如需延长寄存期,应重新签订协议。

七、因不可抗力造成寄存档案受损,甲方不承担赔偿责任。

八、甲方的义务和权利

1.负责提供寄存档案存放的场地、技术设备、管理人员。

2.负责寄存档案的保管、保护,确保档案安全。

3.负责寄存档案的管理、统计、查寻、检索。

4.拥有寄存档案的管理权,有权查验利用者的身份证明。

5.对寄存期满不取走的档案有权进行处置。

九、乙方权利义务

1.寄存档案应具有保存价值,经过整理,编目,也可委托甲方提供有偿整理编目服务。

2.应按收费标准向甲方缴纳费用。

3.查阅利用寄存的档案应出示寄存者有效证明(单位介绍信、身份证、工作证)。寄存者利用其所寄存档案不再收取档案利用费

4.对寄存的档案拥有所有权。寄存期满,如不继续寄存须在期满后60天内取走所寄存的档案。

5.享有优先利用权,并可以对其档案中不宜向社会开放的部分提出限制利用的意见。

6.对因甲方管理不善造成虫蛀、霉变、遗失等问题,有权要求赔偿。

十、本协议执行过程如有未尽事宜,双方协商解决。

十一、本协议一式二份;甲、乙双方各执一份,具有同等法律效力。

甲方(盖章):_________ 乙方(盖章):_________

法定代表(签字):_____ 法定代表(签字):_____

_________年____月____日 _________年____月____日

劳动合同范本(二)

甲方:_________________

乙方:_________________

甲乙双方经协商达成如下:

一、甲方同意保管乙方委托的人事档案。

二、合同有效期为_______年,自_______年______月______日起,至_______年______月______日止。

三、乙方每年应向甲方缴交管理费_________元人民币,合同期内档案转至其他单位,其管理费不予退还。

四、甲方仅为乙方托管人事档案,双方不存在劳动关系及任何行政上的隶属关系,乙方的就业、工资、福利、医疗、人身意外、缴交社会保险费、退休申请及退休养老金的领取等均为自理。乙方在托管期间,其本人发生因病及伤亡事故导致的一切责任均由乙方本人自负,与甲方无关。

五、乙方在托管期间,应自觉遵守国家的有关法律、法规,不得以甲方之名义从事任何违法违纪活动,不得违反计划生育。否则,一经发现,甲方立即单方终止合同,脱离托管关系,托管费不予退回。

六、在托管期间,如乙方由于调动原因需要调阅档案或转至其他单位,需由接收单位出具证明,甲方才给予办理阅档或转档的有关手续。

七、本合同期内,甲方按国家有关规定管理乙方的人事档案,为乙方出具与档案有关的证明、材料。

八、本合同期满后,乙方如不及时交纳托管费除按规定交纳托管费外,每人每日加收滞纳金_________元。

九、乙方如变更地址及联系电话应及时通知甲方,以便联系。如不及时,由此造成的责任概由乙方承担。

十、本合同单方或自动终止时,托管关系自然解除。

十一、本合同未尽事宜,甲、乙双方应友好协商解决。

十二、本合同一式两份,甲、乙双方各执一份,具有同等效力。自签字盖章之日起生效。

甲方(盖章):_________ 乙方(签字):_________

代表人(签字):_______

_________年____月____日 _________年____月____日

劳动合同范本(三)

甲方:_____________________

乙方:_____________________

经甲、乙双方协商,就乙方委托甲方保管档案达成以下协议:

1.甲方根据《档案法》和_________部、人事部有关规定,为乙方保管档案。乙方应在签订本协议及缴交档案保管费后,按有关规定及时将档案及相关资料转入甲方,否则甲方不予提供相关服务。

2.经乙方申请,甲方按国家有关规定,只为乙方提供出具档案保管证明以及借阅档案的服务,不提供其他服务。此外,乙方的就业及与其他机构的关系、工资福利、社保医疗、人身权益及人身意外等均应自理。

3.乙方应遵守国家及省、市的法律法规,遵守甲方有关档案及人事管理规定和计划生育管理的有关规定。

4.本协议期自______年_____月_____日至______年_____月_____日。本协议期满,乙方应及时与甲方续签或将档案转出;否则,视为乙方继续委托甲方保管档案,甲方可依规定的收费标准每年向乙方计收档案保管费,并保留追收乙方欠费的权力。

5.乙方应于签订本协议时向甲方缴交档案保管费_________元,协议期内如档案调出,费用不予退还。

6.本协议由甲方代表人签字,加盖公章及乙方签章后生效。甲、乙双方各执一份,具同等效力。

7.本协议未尽事宜,由甲、乙双方协商解决。

甲方(公章):_________ 乙方(签字):_________

合同存档管理范文3

一、由分管领导在书记办公会或党委会上根据(上级、本镇或基层实际需要)提交工程立项,由入会人员集体议定,并责成镇城建办成立工程项目立项小组,对项目进行详细规划并编制项目预算,形成可行性报告。秘书对会议决议情况进行记录,入会人员在会议记录上签字并存档。

二、镇城建办工程项目立项小组将项目可行性报告、规划、预算等提交书记办公会或党委会集体讨论通过。并责成镇城建办、财政办、审计办等相关人员成立工程招标小组,对项目进行招标。招标分三种情况:

1、直接确定施工单位。由书记办公会或党委会议定,责成镇城建办根据实际情况确定施工单位,镇城建办将确定的施工单位具体情况,施工时间、施工工期、施工技术要求、施工质量、施工监理等情况向书记办公会或党委会汇报,书记办公会或党委会集体讨论通过。秘书对会议决议情况进行记录,入会人员在会议记录上签字并存档。

2、镇域内招标。为促进镇域经济发展,增加税收和就业岗位。对某些工程项目由书记办公会或党委会议定实行镇域内招标,秘书对会议决议情况进行记录,入会人员在会议记录上签字并存档。

3、对外公开招标,对某些技术含量高的特殊工程项目而镇域内企业无法承接。由书记办公会或党委会议定实行对外公开招标。并责成镇城建办、财政办、审计办等相关人员联系机构对外公开招标。

三、确定施工单位后,由城建办负责与施工单位签订施工合同(合同一式四份,施工方、党政办、财政办与城建办存档)。

四、确定项目监理。在项目施工过程中,一般工程由镇城建办派专人进行工程监理,技术要求高的特殊工程,须由书记办公会或党委会确定监理单位对工程进行监理,并对工程监理进行记录存档。

五、工程验收。工程完工后由镇城建办、审计办等部门,组织专门班子或聘请有关专家共同进行验收。

合同存档管理范文4

一、对分管的水电工程质量、安全负全面责任,正确处理进度与质量、安全的关系,管理好项目的均衡施工和工序。

二、负责水电施工过程中重要部位及隐蔽工程的检查验收:确保水电路的走向安全、实用,有保护措施,设计要合理;。

三、检查水电施工工艺流程的执行情况:给排水管路安装工艺,均要求符合安装质量验收要求。强弱电系统施工的技术,要求满足电工艺流程。

四、 负责收集水电施工过程的各种原始记录并及时交资料员存档,所有具有保存价值的文字材料、技术资料交资料室存档。

五、 监督合同的执行情况:监督施工过程中,是否满足设计方案要求;

六、发现施工中的质量、进度、安全问题及时向工程部负责人或公司反映,不得拖延、隐瞒或擅自处理。

合同存档管理范文5

HP集成存档平台还可以通过将主存储系统中的信息存档到其他位置以及消除存储拥塞来帮助您实现以下几点内容:最大程度地提高电子邮件、文件和应用程序服务器的性能、推迟新的主存储系统的资本支出、减小数据备份的大小。

HP集成存档平台将世界一流的HP服务器与网格存储技术和本地内容索引、搜索以及策略管理软件组合为一个工厂装配的架装系统,该系统为存档可缩放性、性能、安全性和灵活性设置了标准。

HP集成存档平台将经客户验证的HP ProLiant服务器和StorageWorks网格存储器与内置索引、搜索和策略管理软件相结合使用HP集成存档平台,可以将电子邮件、文档、打印流和数据库信息保留在一个位置,并满足企业中不同利益相关者的需要。

第一,无与伦比的可扩展性和性能提供了一个迅速响应、成本有效的电子发现基础,可帮助法律顾问和记录管理员快速响应同时颁布的法律,避免由于不合法规而经常导致法院罚款、法律费用和诉讼费用。

第二,无限的Microsoft ExchangeNlIBM Lotus Domino电子邮件收件箱功能,使企业用户摆脱了生产基础配额和邮件大小的限制。

第三,极具吸引力的价格使IT部门能够将信息保留在更易搜索、更易管理的存储层中(因为信息的价值会随时间的变化而变化)。

第四,以HP的设计、实施和支持服务作为后盾,财务部门可以简化合同,与一个可信供应商合作。

同时,HP集成存档平台提供的功能可满足最严格的企业内容存档和电子发现要求。

第一,工厂集成的方法可简化安装和维护,并可增大投资的安全性。利用HP集成存档平台,不必再购买单独的存档客户端软件、服务器、操作系统、索引和搜索软件以及内容可寻址的存储器。

第二,可缩放性能够适应数据的迅速增多。使用HP集成存档平台,可以摆脱可缩放性的限制,也不必被迫创建多个无法管理且难于搜索的存档存储库。

第三,较高的性能可确保电子发现的迅速响应。使用标准存档解决方案时,随着存档文件的变大,搜索性能不断降低,而HP集成存档平台的创新式体系结构基于网格,能以智能方式在数百个智能单元(每个智能单元都可以并行运行)间分配内容、索引和处理能力。

第四,能够促进合法性和合规性。HP集成存档平台提供了许多内置的电子发现和合规,可帮助您遵循行业特有的规定并改进遵循情况。

第五,本地支持电子邮件存档。HP集成存档平台与配套产品(用于Microsoft Exchange的HP电子邮件存档软件和用于IBM Lotus Notes和Domino的HP电子邮件存档软件)配合使用,可提供完整的端到端电子邮件存档解决方案。

合同存档管理范文6

笔者结合企业调研情况,在强化动态管理、构建履约监控等方面提出若干制度构想,以深化公司内控制度为抓手,不断完善公司法律风险防范机制。

一、 存在问题与现状

企业在订立和履行合同时,往往偏离相关的合同法律规定,缺乏依法订立和依法履行合同的意识,使所签订的合同违反法律及行政法规的强制性规定。

例如:在逾期违约金处理的条款上,有的合同将“逾期1天支付违约金XX元”写为“逾期1天罚款XX元”,这样的条款就属于无效条款。任何背离合同法所签订的合同都是无效合同,不受法律保护。

其次,只是将签订合同当作一种形式,没有认识到合同是双方权利义务实现的保障书。

例如:大额、长期的设备改造及基建安装等合同,由于涉及金额大、执行时间长,外部经济环境对合同的执行往往会产生巨大影响。遇到钢材涨价、银行利率提高、通货膨胀、供应商生产能力因供不应求而紧张等情况,供应商就会以无利可图、甚至赔本等原因要求前行终止合同,而我公司在没有严格的合同违约条款制约对方的情况下,只能默认供应商提价要求,增加生产成本,否则就要面临影响企业正常生产的窘境,给企业的生产经营带来隐患。

此外,经办部门在合同签订前要进行一系列合同审批程序,这一阶段合同受到高度重视。一旦合同签订即被束之高阁,成为付款的凭证。这种合同签订与合同执行脱节的情况在履约过程中普遍存在。

二、分析及对策

(一) 进一步增强合同意识,加强法制宣传教育

要做好合同订立工作,人是关键因素[1]。只有当思想上真正意识到合同的重要性,公司全员强调按合同办事、按管理办事,才能使合同管理出成绩、出效益。

公司决策层应当重视这项工作。把法制教育,特别是《合同法》的教育,作为公司各级领导干部学习的重要内容。定期参加《合同法》知识讲座,在公司中层领导干部培训中增加合同管理内容,使公司领导率先建立起合同管理理念,营造人人重视合同管理的氛围,强化全员管理意识。

着力打造一支业务专,素质高,能力强的合同管理员队伍。合同管理的专业性、技术性都较为复杂,合同管理人员的业务素质的高低,也直接影响着合同管理质量,因此企业对合同管理人员必须从严要求。招聘或选调一批素质高、学习能力强、知识面广、责任心强的人员充实合同管理队伍。可以效仿一些施工建筑行业的合同管理人员职业资格制度,建立岗位责任制,在岗位系数及薪酬方面适当倾斜,鼓励竞争上岗,完善岗位职责和绩效考评机制,实行末位淘汰,对上岗人员组织定期学习,结合公司实际进行正方面的实例分析,通过专题学习提高业务水平、理论水平。

推行培训制度。邀请专家学者定期对企业员工进行合同管理培训及考核,促进全员合同管理素质的提高。此外,还要加快推行相应的合同示范文本制订,统一合同统计台帐,从根本上提高合同管理工作水平。

(二) 科学设计合同管理内控流程与衔接环节

随着合同关系的发展,经办部门办理合同业务流程应经过:合同立项、合同签订(洽谈、送审、订立)、合同履行、合同付款、合同存档等五大环节[2](如图1)。经办部门的业务流程相对应着两道审核监督关卡:一是审核职能部门(企管、财务、审计、办公室、公司领导)按管理制度规定,对合同业务可行性、规范性、合法性进行会审会签,对每道合同环节层层把关的管理过程;二是由纪检部门(监察部、廉政监督小组)对全过程的业务开展和审核流程进行廉政监督、效能监察的再监督过程。

图1 合同管理内控示意图

除部分特殊业务(不必签订书面合同或所签订合同可以不必送审)外,所有对外签订的合同均受采购管理、合同管理、付款管理、档案管理四项管理流程控制。换句话说,项目全程管理流程是由此四项子管理流程构成。四项子管理流程必须综合考虑审批程序,设置统一的审批权限,明确各职能部门的审核职责,责任到岗,落实到人。子管理流程之间衔接工作环节,如商务谈判、合同交验等工作流程应尽快纳入流程控制范畴。将前一项流程控制所形成的管理记录,作为下一项流程控制审核的支撑性材料,材料不全者一律退回,最终存档时形成资料齐全、一项目一档[3]。使合同的签订、履行、付款、存档都处于有效的控制状态。

同时,构建由公司经理层统一领导,合同管理部门专职管理和业务部门分管负责的组织网络,是形成良性互动管理生态,强化动态管理的基本要求。企业管理部、审计部与财务部是合同管理部门承担着合同的综合管理,即对业务开展具有管理职责,又负有监督业务开展的义务。而监察部门(监察部、廉政监督小组)是流程控制的再监督部门,以廉政监督、效能监察或受理投诉的方式,定期或不定期抽查项目进展情况,发现业务过程中存在违规违纪或不按规定办事的行为提出整改或处理意见。